Win – City of San Jose – Fourth Street 84″ Interceptor Design-Build

Adding to a string of Design-Build pursuit wins for 2018, our client team of Steve P. Rados Construction with Stantec and Vadnais Trenchless Services recently earned the San Jose Fourth Street 84″ Interceptor DB contract. Subconsultant team members included RMA Group, Inc. (Construction Quality Management) and CirclePoint (Public Outreach and Stakeholder Communications).

Importantly, this is Mission Critical’s second Design-Build win with the Rados/Stantec team, the first being the $60M City of Modesto NVRRWP Waterwork Design-Build in 2017.